We were pretty tired after yesterday's activities so here is the update. Sam worked on removing the railing from the section that is now in the bathroom. These were schedule 40 3-inch pipes that could have held back a car. We burned through all of the sawzall blades but got them removed.
They also made one impressive pan pipe.
The plan is to put frosted glass here to let extra light into the bathroom.
The box will be a tiled portion in the shower to keep shampoo bottles and the like.
The tub, fixtures, valves, and tile are still being shipped. Once those show up we can get the plumber in to install the new equipment.
The plan is to put frosted glass here to let extra light into the bathroom.
The box will be a tiled portion in the shower to keep shampoo bottles and the like.
The tub, fixtures, valves, and tile are still being shipped. Once those show up we can get the plumber in to install the new equipment.