This weekend Elizabeth came to visit so we spent most of the time doing the tourist thing in KC. Saturday morning John did the Psycho Psummer 15 mile trail race and Sam did a 56 mile bike ride.
After all of the exercise Sam continued mudding drywall.
We also finished installing the tile backer board on the floor so it is starting to look more finished.
All of the tiling is completed and grout sealed. The shelf is made out of a scrap of glass from the new wall.
We stopped by architectural salvage and picked up a door for the bathroom. It is a six panel solid oak door that will get refinished and stained.
We also finished installing the tile backer board on the floor so it is starting to look more finished.
All of the tiling is completed and grout sealed. The shelf is made out of a scrap of glass from the new wall.
We stopped by architectural salvage and picked up a door for the bathroom. It is a six panel solid oak door that will get refinished and stained.