Hurricane Issac brought us some much needed rain, which let me get some more trailer work finished. I installed a few more body supports and interior skin and managed to get some painting completed in preparation for the kitchen cabinets. The lower kitchen cabinet is installed. Laminate showed up this week so we can get the top finished and get the sink in. After some looking and debating we ended up sticking with the original sink. It is in really good shape and will be one of the few original pieces.
For laminate we went with Arborite textured light blue.
The drawer pulls are reproductions of the original style from rejuvenation.
This is probably one of the last views from outside. After the closet is installed I can button it up.
No comments:
Post a Comment